b'Facility Master PlansHarrison County CampusRUNNYMEADE DRIVE1.10 1.10 1.102.9 1.123.10 2.122.123.52.9 1.12 2.8PERMANENT BUFFER2.12 3.23.83.6 2.6 1.5 1.12.42.1 1.93.4 3.3 2.11 2.10 2.71.8 3.7 2.3 2.122.12 1.7 2.5 2.33.1 2.12 2.3 2.21.11 2.3 2.32.9 1.12 1.3 2.21.4 1.7 1.7 1.6 3.93.91.12SWITZER ROAD EULA DRIVE 1.2Map Legend 1.2DEBUYS ROADNPhase 1 (13 Years) Phase 2 (46 Years) Phase 3 (610 Years)1.1 New STEM Building 2.1 New IT Center of Excellence 3.1 Construct a New Maintenance Facility with Storage on the West Side 1.2 New Access Road Along Eula Drive 2.2 Renovate Existing D Building with Flooring, Paint, Etc. of Campus1.3 Relocate Administrative and Business Offices to Upstairs Student (Includes Auditorium & Restrooms) 3.2 Close off Debuys Road Services Building 2.3 Upgrade the Campus Courtyards with New Shrubbery, Furniture, etc.3.3 Renovate Gym Restrooms & Locker Rooms1.4 Renovate Existing Restrooms in the Student Services Building 2.4 Renovate Existing G Building to Expand the Learning Lab/Library to the Vacated 3.4 Remove Pool to Add Additional Green Space1.5Relocate Social Studies Offices to the Existing Developmental/Drafting Social Studies Offices 3.5 Add Canopy to Childcare Facility(S) Building2.5 Develop the Current Administrative Suite to Become a Student Focal Point3.6 Extend Plaza to the West Side of Campus1.6Complete Remaining Soffit & Fascia Upgrades throughout the Campus 2.6 Remove Non-Renovated Tennis Court for Additional Parking or Green Space 3.7 Renovate Commons Area (Including Restrooms) with New Finishes1.7 Renovate Two Remaining Sets of Usable Exterior Restrooms2.7Add New Flooring to the Existing Drafting/Developmental Education (S) Building3.8 Renovate the Existing Q Building for Programs Discontinue Use of Third Exterior Restroom in the Vehicle Compound& Renovate Restrooms 3.9 Addition of Focal Point Features at Main Entrances Existing1.8 Upgrade Entryway Near the Bookstore (Lighting, etc.)2.8 Renovate Existing P Building with New Flooring 3.10 Renovate Math and Computer Science (X) Building with New Finishes 1.9 Complete Library Facelift 2.9 Construct Additional Parking Spaces Around the Exterior of Campus Existing New Facility1.10 Reconfigure Existing Parking Spaces Near IMPAC 2.10 Renovate H Building with New Flooring (Including Renovation of Restrooms) Existing New Facility Renovation1.11 Relocate Bookstore to Front of Campus 2.11 Renovate Learning Lab and Library to Enhance Connection1.12 Add Directional Signage Throughout Campus 2.12 Parking Lot Restoration and ResurfacingNew Facility RenovationRenovation26 MGCCC STRATEGIC PLAN2030'